Slowly does it
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati

Building Cello #2

Rib structure finished

1/5/2021

0 Comments

 
The rib structure is finished for now. The linings provide structural rigidity for the ribs and the shape of the outside is now well defined. I will not remove the last layer of the mould until the plates are ready to be glued on so that the ribs keep their shape. Once the last layer is removed, the blocks still need to be shaped.
Picture
0 Comments



Leave a Reply.

    Author

    Elias keeps growing so a bigger cello will be needed eventually. With the previous cello I had to hurry up a little as Elias needed it already. With this one I want to avoid the pressure.

    Archives

    April 2022
    January 2022
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021

    Categories

    All
    Back
    Blocks
    Front
    Linings
    Link
    Mould
    Planning
    Purfling
    Ribs
    Tool
    Workshop

    RSS Feed

Site powered by Weebly. Managed by Avaruus.net
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati