Slowly does it
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati

Building Cello #2

Removing the top of the mould

22/4/2021

0 Comments

 
The mould has almost served its purpose. Time to remove the top of the mould so that I can install the linings. Both sides of the mould have T-nuts on the underside so that the mould can be lifted using some bolts. I also had managed not to glue the plate to the sides so this was very easy. Before I removed the top of the mould I used a pencil to mark where there was a bit of a gap between the sides and the mould so that I can ry to correct that with the linings.
0 Comments



Leave a Reply.

    Author

    Elias keeps growing so a bigger cello will be needed eventually. With the previous cello I had to hurry up a little as Elias needed it already. With this one I want to avoid the pressure.

    Archives

    April 2022
    January 2022
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021

    Categories

    All
    Back
    Blocks
    Front
    Linings
    Link
    Mould
    Planning
    Purfling
    Ribs
    Tool
    Workshop

    RSS Feed

Site powered by Weebly. Managed by Avaruus.net
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati