Slowly does it
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati

Building Cello #2

Making the mould part III

23/2/2021

0 Comments

 
I made the central layer of the mould today and started to glue on the spacers. The central layer only touches the blocks. It would not be possible to remove the mould from the inside after the linings have been glued to the ribs otherwise. In order to align the different layers accurately, I had already drilled holes in all the plates before routing them to match. The spacers also have holes drilled through them to align the plates well. In addition I checked all the surfaces where the blocks will be glued that they indeed match. Which they did.
0 Comments



Leave a Reply.

    Author

    Elias keeps growing so a bigger cello will be needed eventually. With the previous cello I had to hurry up a little as Elias needed it already. With this one I want to avoid the pressure.

    Archives

    April 2022
    January 2022
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021

    Categories

    All
    Back
    Blocks
    Front
    Linings
    Link
    Mould
    Planning
    Purfling
    Ribs
    Tool
    Workshop

    RSS Feed

Site powered by Weebly. Managed by Avaruus.net
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati