Slowly does it
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati

Building Cello #2

Glueing the front

5/4/2021

0 Comments

 
I glued the front also today. First I attached one side to the table and then prepared everything ready for the glue up. Once the glue was hot I heated the joint with a heat gun for a while and then spread the glue. Then I rubbed the second half over the first one until it stuck. When the two pieces fit well, this should be enough to get good joint. I was uncertain however and added some clamps anyways. The idea of the rub joint is that since one doesn't need to use clamps, the joint is stress free which should be better.
0 Comments



Leave a Reply.

    Author

    Elias keeps growing so a bigger cello will be needed eventually. With the previous cello I had to hurry up a little as Elias needed it already. With this one I want to avoid the pressure.

    Archives

    April 2022
    January 2022
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021

    Categories

    All
    Back
    Blocks
    Front
    Linings
    Link
    Mould
    Planning
    Purfling
    Ribs
    Tool
    Workshop

    RSS Feed

Site powered by Weebly. Managed by Avaruus.net
  • Home
  • Workshop
  • Cello
  • Cello #2
  • Ducati